Skip to main content

Berengrove Care Home

Client: Langley House Trust
Location: Gillingham
Value: £ K

Berengrove Care Home

The Challenge

Berengrove Care Home required a sensitive yet extensive refurbishment of its detached Victorian property. The building’s age, layout, and deteriorating infrastructure created significant operational and compliance challenges. Outdated electrical systems, inadequate accessibility, and structural wear made the environment unsuitable for modern care standards. The client needed a complete internal and external renewal, all delivered with minimal disruption and a strong focus on safety within a care setting.

Our Solution

ECMS carried out a comprehensive refurbishment, beginning with a full internal strip-out to expose and address the building’s underlying condition. A complete electrical rewire was delivered to bring the property up to current regulations, supported by the installation of new ceilings and flooring throughout.
We installed a new fire alarm system and upgraded the building to meet DDA compliance, including accessible washrooms, widened doorways, and the installation of a disabled lift. Externally, we completed roof repairs, repointing, re-rendering, and landscaping to restore the building’s structure and appearance.
Our team coordinated every phase carefully to respect the needs of residents and staff, maintaining clear communication and strict safety controls throughout the project.

The Results

The refurbishment has transformed Berengrove Care Home into a safer, more functional, and fully compliant environment.

Key outcomes include:

  • Fully modernised electrical infrastructure
  • Improved accessibility through DDA-compliant adaptations
  • Enhanced fire safety with a new alarm system
  • Fresh ceilings and flooring that brighten and modernise the space
  • Restored external structure offering improved protection and kerb appeal
  • A more comfortable, navigable, and supportive environment for residents and carers

Health & Safety Considerations

Working within a care environment and an ageing structure required strict adherence to safety protocols. The project was F10 notifiable, and specific controls were implemented to manage:

  • Ventilation in enclosed or dusty work areas
  • Noise and vibration exposure affecting vulnerable residents
  • Structural integrity risks during strip-out and renovation

Our team maintained continuous monitoring and documentation to ensure full compliance at all stages.

Works Delivered

Full strip out
New plumbing installations
Fire doors and fire alarms
Roof repairs, external render repairs and repaint
Rewiring electrics
New kitchen facilities
Installation of new PVC windows

A business offering unparalleled customer service above & beyond in the commercial facilities arena.

Core Services