Tel: 01474 876800 • Client Portal
High level glazing seal replacement works recently carried out to the atrium roof, we raked out and removed the existing silicone joints from every perimeter butt seal. The glass edges were thoroughly cleaned and a new continuous structural (Dow Corning) silicone joint was applied. These repairs were carried out by abseiling from the roof down to the atrium roof below as shown in photos.